Deployment Plan
1. Introduction
This document describes how to deploy the application to production.
2. Pre-deployment Checklist
- [ ] All code has been reviewed and merged to the main branch.
- [ ] All tests have passed.
- [ ] The production environment has been backed up.
3. Deployment Steps
4. Rollback Plan
In the event of a deployment failure, the following steps will be taken to roll back to the previous version: